Educational | Healthcare | Religious | Municipal | Senior Living | Green Buildings | Careers |
 
 
 
 
   
 

NEW PROJECTS

Engine Company 109
Gottlieb Hospital
Six West
Greater Grand Crossing Library
GSA - EPA Lab Renovation
Little Village Branch Library

ACTIVE PROJECTS

Boone Clinton Elementary School
Coal City High School
Lee Pasteur Elementary School
Near North Montessori School
Powell Elementary School
South Shore High School

Avery Family YMCA Pool
Plainfield, Illinois

 

 

Updated 12/1/08

Owner: Greater Joliet Area YMCA
Architect: Healy, Bender & Associates, Inc.
Contract Type: Construction Manager Lump Sum

The new Avery YMCA Family Pool addition is located at 15120 Wallin Drive in Plainfield, Illinois. This 15,000 sf. addition is designed to feature a family-like indoor water park including double slides, plunge pool, lazy river float area, toddler slide and play areas. The facility will include a 4,500 sf. multipurpose room (Conference/Party room). The pool facility is constructed of precast concrete panels; the multipurpose room is constructed of structural steel and CMUs.  All work connected to the pool construction follows strict guidelines set by the Illinois Department of Health. The project also includes structural renovations and finish work to the existing YMCA facility at the connecting point of the two buildings.  Construction started in April of 2008 and is scheduled for completion at the end of October 2008.