The George Sollitt Construction Company

Features

The building contains administrative offices,
classrooms, a field house, gymnasium,
fitness center, shower and locker facilities,
full kitchen with cafeteria, auditorium,
media center, and five mechanical rooms.

Location
Plainfield, Illinois

Owner
Plainfield South CSD 202


Architect
Healy Bender & Associates
 

Plainfield Central High School

Description

This 280,000 square foot educational
facility has a structural steel frame
and load bearing masonry walls. The
building contains administrative offices,
classrooms, a field house, gymnasium,
fitness center, shower and locker facilities,
full kitchen with cafeteria, auditorium,
media center, and five mechanical rooms.
The 750 seat auditorium is served
by a separate mechanical room with
specialized sound dampening equipment
and features 30 feet of high movable
partitions, an orchestra pit, and advanced lighting and sound systems. The band room is enclosed by structurally insulated walls and floors. This High School is a replacement to original School that was destroyed by a tornado. The District required the new facility to be put on an accelerated
construction schedule of fifteen months - more than four months ahead of the original schedule.