The Plainfield Lockport Street Streetscape project included the
complete replacement of the road and sidewalk on Lockport Street
between James Street and 59 Illinois Street in the heart of
downtown Plainfield’s business district. Work included the
replacement of an aging water main, water and sanitary sewer
service laterals, reconfiguring of two-way traffic and the
widening of sidewalks.
As Construction Manager and General Contractor
our team provided extensive preconstruction services including budgeting,
scheduling, pedestrian and construction safety plan and site logistic phasing
plan. The design provides an enjoyable, safe and comfortable pedestrian environment
for shopping and dining.
The Lockport Street Streetscape project
used carefully
chosen quality materials that were incorporated into a streetscape, including:
- Limestone
- Brick pavers
- Granite accent banding
- Colored concrete
Features
included:
- Stone seat walls with fiber optic accent lighting
- Planter and tree
pits
- Benches
- New signage
- Street lighting