Educational | Healthcare | Religious | Municipal | Senior Living | Green Buildings | Careers |
 
 
 
 
   
 
Abraham Lincoln National Cemetery
Avery Family YMCA Pool

Bartlett Village Hall

Cook County Domestic Violence Courthouse
Fort McCoy
Goldblatt's Building Rehabilitation
Glenwood Village Hall
Hanover Park Fire Station

Lockport Street Streetscape 

Niles Health and Wellness/Senior Center
Oak Park Street Improvements
Orland Park Police Facility
Park Ridge Service Center
South Water Purification Plant
 

Trumbull Park Homes
 

 

 

Hanover Park Fire Stations

Hanover Park, Illinois

 

Architect:

Sente Rebel Boxman

 

Lee Architects

Awards:
"Suburban Branch Project of the Year"
   - American Public Works Association
     Chicago Metropolitan Chapter 2006


The Hanover Park Fire Station No. 1 is located at 6850 Barrington Road, Hanover Park, Illinois. This 26,374 SF facility features five garage bays that allow equipment parking, storage and staging. The two story structure includes second floor living quarters for twelve on-site personnel, men’s and women’s locker rooms and two slide poles. The daily administrative operations are located on the first floor including offices and conference room. The lower level includes a large training room and exercise room.

Constructed of masonry load-bearing walls with steel-supported precast plank floors, a hot water heating system, and ducted air circulation. During construction our team discovered contaminated soil and removed 6,000 cubic yards of soil and replaced it with stone.

Through value-engineering with the Architect, Sente Rubel Bosman Lee Architects, we were able to provide a more efficient heating system by using more boilers, of a smaller size, which enables more control and efficiency. The Owner saved in excess of $20,000. The project broke ground on June 1st 2005 and was officially dedicated July 22nd 2006.