Services
General Contracting
- Loyola University Medical Center – Ambulatory Care
- South Shore High School
- GSA EPA Central Regional Lab
- Polish Consulate
- Illinois Valley Community College
Construction Management
- Coal City High School
- Jackson Park Hospital
- Oak Park Marion Street Renovation
- Orland Park Police Headquarters
- Near North Montessori School
Pre-Construction
Sollitt typically provides comprehensive cost input at four phases of design; at the completion of schematic design, 50% design development, 100% design development and at 50% completion of the construction documents.
Back to topDesign / Build
- Parkview Medical Office Building
- American Electric Power
- W.W. Grainger Store
- UNO Charter Schools
- Gottlieb Memorial Hospital
Scheduling / Planning
Sollitt will develop a Master Schedule that includes activities and responsibilities of all team members from early design to project closeout. Construction Schedules are developed with full consideration of team member input.
Back to topValue Engineering
Sollitt’s responsibility is to provide complete and accurate data regarding efficient solutions to the program requirements so that the team can make informed decisions regarding alterations to the emerging design. Value engineering is an on-going process that doesn’t end when the project bids.
Back to topLEED / Sustainability Construction
Most of our people are LEED Accredited and thus able to contribute meaningful suggestions throughout the pre-construction and construction phases to arrive at the level of LEED certification sought by our clients.
Back to topBuilding Information Modeling (BIM)
Sollitt has invested in the staff, hardware, software and training so that we interface in a meaningful manner with architects and subcontractors who are likewise astute with these tools.
Back to top