The George Sollitt Construction Company

C.W. Avery Family Center

Features
One Story

15,000 square foot addition
10 months Construction Duration

Description
The Avery YMCA Family Pool addition is located in Plainfield, Illinois. This addition was designed to provide a family friendly indoor water park including double slides, plunge pool, river float area, a totter slide and play areas. The facility includes a 4,500 SF multipurpose room (Conference/Party room). The pool facility is constructed of precast concrete panels; the multipurpose room is constructed of structural steel and CMUs. The project also involved structural and interior renovation of the existing YMCA facility.

Location
Plainfield, Illinois

Owner
Greater Joliet YMCA

Architect
Healy, Bender & Associates