The George Sollitt Construction Company

Features

212,285 square feet
Three floors plus lower level
Substantial Completion – May, 2013
Construction Duration – 23 months


Location
Chicago, Illinois

Owner
Public Building Commission of Chicago / CPS

Architect
 STL Architects, Inc.
 

Description
This project will implement the Chicago Public Schools Urban Model High School (UMHS) prototypical design to serve 1200 students. This steel frame and masonry construction building will include music, art and athletic functions. The building will also include a full-service purpose CPL community library within the school. This prototype building achieved LEED Gold for Schools minimum “Silver” level certification.

Back of the Yards High School